WFMFORGE CALCULATOR

Capacity vs. Demand Calculator

Compare staffed capacity against forecast demand and required FTE, then see coverage, over/under staffing, and volume headroom in one view.

INPUTS

Demand & staffing assumptions

This is a straight-workload capacity model. It is best for non-queue workload or for high-level capacity planning where service-level queue effects are not being modeled.

CAPACITY POSITION
Covered
Your current staffing is above the modeled requirement.
Required FTE
36.8
Coverage
122.3%
Over / Under FTE
+8.2
Volume Capacity
12,240
Volume Headroom
+2,240
Productive Hours
1,224.0
Operations view: Staffing provides 22.3% more FTE than required under these assumptions.
Workload Hours = Volume × AHT ÷ 3,600
Required Productive FTE = Workload Hours ÷ (Paid Hours × Utilization)
Required Scheduled FTE = Productive FTE ÷ (1 − Shrinkage)
Volume Capacity = Productive Hours × 3,600 ÷ AHT
HOW TO READ THE OUTPUT

Required FTE is the scheduled staffing needed after utilization and shrinkage assumptions are applied. Coverage % compares staffed FTE with required FTE. Volume headroom estimates how much more or less workload the current staffing can support at the same AHT and utilization assumptions.

Important: If your operation already embeds productivity losses inside shrinkage, do not double-count them through both utilization and shrinkage. For inbound voice or other SLA-driven queues, use a queueing model such as Erlang C instead of treating this as interval queue staffing.

Need a capacity model built around your operation?
WFMForge can build custom vendor capacity plans, weekly requirement models, interval views, or headroom trackers around your own raw data.
Request a custom capacity model

What this means for Operations

Coverage above 100% means the modeled staffing total is above the modeled requirement—it does not prove every interval is covered. A daily or weekly surplus can coexist with shortages during peak periods.

Use the aggregate capacity position to understand whether enough staffing exists in total, then check interval fit before deciding that the operation is safe.

Read Weekly Coverage vs. Interval Risk →