WFMFORGE CALCULATOR

Erlang C Staffing Calculator

Estimate the net agents required for an inbound queue to achieve a service-level target, then apply shrinkage separately to convert net staffing into a scheduled requirement.

ERLANG C INPUTS

These are the core Erlang C inputs. Occupancy is calculated from offered load and the resulting staffing level—it is not used as a standard Erlang C input here.

ERLANG C OUTPUTS
29
Net agents required in the interval
Achieved SLA
81.6%
Occupancy
82.8%
ASA
17.4s
Probability of Wait
24.2%

120 offered contacts in 30 minutes at 360 seconds AHT creates 24.00 Erlangs of offered load. 29 net agents are the minimum staffing level that achieves at least 80.0% in 20 seconds under the Erlang C assumptions.

Offered Load = 120 × 360 ÷ 1,800 = 24.00 Erlangs
Net Agents = 29
Occupancy = 24.00 ÷ 29 = 82.8%
PLANNING ADJUSTMENT — AFTER ERLANG C

Convert net agents into scheduled staffing

Shrinkage is not part of the Erlang C queue calculation. Apply it after the net staffing requirement is known.

Scheduled FTE equivalent
36.3
37 if rounded up to whole people
WEEKLY CAPACITY — OPTIONAL

Convert weekly workload into total weekly FTE

Use this for capacity planning. It complements interval Erlang C; it does not replace it.

WEEKLY CAPACITY RESULTS
Workload hours
2,500.0
Productive FTE
73.5
Scheduled FTE
91.9
How this is calculated
Workload Hours = Weekly Volume × AHT ÷ 3,600
Productive FTE = Workload Hours ÷ (Paid Hours × Utilization)
Scheduled FTE = Productive FTE ÷ (1 − Shrinkage)
Important: Weekly capacity tells you whether enough staffing exists in total. It does not show whether that staffing is placed in the right 30-minute intervals. Use Erlang C or an interval staffing view for queue-level timing and service-level risk.
WEEKLY ERLANG CAPACITY — DIRECTIONAL

Weekly Erlang Capacity Planner

This view converts weekly demand into an average interval, runs Erlang C at that interval, and rolls the resulting agent-hours into a weekly FTE requirement. It is useful for vendor and capacity planning when an interval forecast is not yet available.

WEEKLY ERLANG RESULTS
Scheduled weekly FTE
—
Avg contacts / interval
—
Avg interval net agents
—
Net agent-hours / week
—
Net weekly FTE
—
Avg interval occupancy
—
Peak interval agents
—
—
How to interpret this: the weekly FTE is based on an average interval across the operating week. The peak-factor result is shown separately as a stress check and is not applied to every interval. For a true production staffing plan, use the actual 15/30/60-minute arrival pattern and sum Erlang-required agent-hours across the week.
MODEL ASSUMPTIONS

When Erlang C is appropriate

Erlang C is commonly used for inbound queues where contacts arrive randomly, agents handle one contact at a time, handling times are independent, and waiting contacts do not abandon. It is most appropriate for voice-like queues without concurrency.

Occupancy is an output: once the model finds the net agents needed to meet the service-level target, occupancy is offered load divided by those net agents.

For chat concurrency, abandonment-sensitive environments, callbacks, skill-based routing, or highly blended work, use a model that reflects those operating conditions rather than treating Erlang C as a universal answer.

Need this built around your queue structure?
WFMForge can help build custom staffing models, interval views, or planning workbooks around your own assumptions and data.
Request custom WFM help

What the outputs mean

Net agents are the concurrent agents needed in the interval before shrinkage. Occupancy, ASA, probability of wait, and achieved service level are outputs from that staffing result. Scheduled FTE equivalent is a separate planning adjustment after shrinkage is applied.

How to use an Erlang C calculator for call center staffing

Start with a consistent forecast interval (such as 30 minutes), the contacts expected during that interval, average handle time in seconds, and the target service level and answer-time threshold. Erlang C then estimates the concurrent net agents needed under its queueing assumptions. Review achieved service level, average speed of answer (ASA), probability of wait, and occupancy before applying a separate shrinkage adjustment.

Worked example: 120 calls in 30 minutes

At 120 calls per 30 minutes and a 360-second AHT, offered traffic is 120 × 360 ÷ 1,800 = 24 Erlangs. For an 80% service-level target within 20 seconds, the calculator’s default scenario estimates 29 concurrent net agents. With 20% shrinkage, that is 29 ÷ 0.80 = 36.25 scheduled-agent equivalents for planning. Whole-person schedules may require rounding up and must account for interval-by-interval coverage.

Erlang C staffing FAQs

Is occupancy an input or an output?

In this calculator, occupancy is an output: offered load divided by the net agent count. It helps explain the staffing and service-level tradeoff; it is not an additional target forced into the standard Erlang C calculation.

Can I use Erlang C for chat or queues with abandonment?

Standard Erlang C assumes one contact handled per agent at a time and does not model abandonment. Concurrent chats, significant abandonment, callbacks, and complex blended routing need a model that represents those conditions.

Does the weekly Erlang planner replace interval staffing?

No. Converting weekly demand into average intervals is a directional capacity estimate; it can hide daily and intraday peaks. Use a genuine interval forecast and interval-level staffing checks for service-level commitments.

Continue with our service-level guide, occupancy guide, and shrinkage calculator to understand the related planning assumptions.

What this means for Operations

Erlang C shows the tradeoff between staffing, service level, occupancy, and waiting time for a simplified inbound queue. Adding one or two agents can materially change queue performance when staffing is close to the required level.

Do not use Erlang C blindly for chat concurrency, abandonment-heavy queues, callbacks, blended work, or complex skill routing. The model should match the operation.

Read Occupancy vs. Utilization vs. Productivity →